Civil Engineering and Development Department HKSAR has appointed Fugro
Technical Services Limited (FTS) to undertake the Environmental Team services
for the Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 March and 31 March 2019. As informed by the
Contractor, major activities in the reporting month were:
Excavation
and laying of drainage pipe and manhole;
Excavation
and ELS construction.
Construction
of SUS structure; and
Construction
of District Cooling System.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP at KTD1a, KTD2b and KER1b in the
reporting month.
iv.
A Limit Level
exceedance was recorded. Exceedance was recorded for construction noise Limit
Level at KTD2b on 22 March 2019. No Action / Limit Level exceedance was
recorded for construction noise at KTD1a and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
v.
No environmental
complaint, notification of summons and successful prosecution were received in
the reporting month.
Reporting
Changes
vi.
There was no
reporting change in the reporting month.
Future
Key Issues
vii. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impacts.